Stickney Sludge Facility

Facility

  • General Contractor James McHugh Construction Co.
  • Architect AECOM
  • Developer Metropolitan Water Reclamation District
  • Square Footage 100,000 | 20,000 SF

Many projects rolled into one, some of the work performed at Stickney, the world’s largest water reclamation plant, included increasing the capacity and improving the efficiency of the wastewater treatment process in the Sludge Thickening Facility. This was achieved by building a new concrete and precast building that contains 8 tanks–each 80 feet in diameter.

Let’s Talk About Your Project